Feiying New Tether Power Compatible Dji M4td Drone Power System, Providing Long Endurance Uninterrupted Power Supply Wiith High-Power Floodlight. G12-55m-L6

Customization: Available
Input Voltage: 190~240VAC
Output Voltage: 600~850VAC

Product Description

Basic Specifications
Model NO.
G12-M4TD 55m
Net Weight
4.8kg
Cable Weight
5G/M
Cable Length
Customize
Transport Package
Wheeled Aviation Case
Specification
D275×W146×H200±0.5mm
Origin
China
Capacity
3000
Technical Parameters
Support flight altitude: 33~55m (tether cable 33/55m, reserved safety length)
Supported flight duration: ≥24h
Portability: Small size, lightweight, backpack storage, easy to carry
Automatic Operation: No need to operate the tether box for take-off and landing. Automatic take-up with backup battery support.
Stabilization: Voltage stabilisation of the air module, preventing battery drop or recharge issues.
Tether Power System 1
Tether Power System 2
Product Technical Highlights
DJI M4TD G12
Tethered power supply for long flight: Continuous flight ≥24h, constant voltage output.
Automatic take-up and pay-off: Easy to operate during take-off and landing.
Rich Load, Unlimited Expansion: Supports Gimbal cameras, floodlights, searchlights, and shouting devices.
Highly protective: IP54 rating for wide range environmental adaptability.
Comprehensive protection: Separation of strong/weak power, automatic protection in case of failure.
General Specifications
System Overview
Compatible ModelsDJI Matrice 4TD
Flight Altitude30m or 50m (Cable: 33m or 55m)
Safety FeaturesContactless operation, high-voltage isolation, synchronized auto-retract
EnvironmentWorking: -20~45℃, Protection: Air IP54 / Ground IPx4
Packing sizeD495×W410×H220mm, Weight: 3kg
Tethered Box (Ground Module)
Input Voltage190~240VAC, 50/60Hz
Output Power1200W (Rated) / 1500W (Peak)
Reel Speed0~3m/s Intelligent dynamic adjustment
Data DisplayVoltage, current, temperature, power, length, operating time
Cable MaterialSilver-plated copper + Teflon + Kevlar weaving
Certifications
Certifications
FAQ
 Are you a factory or a trading company?
We are a manufacturing factory with over 10 years of production experience specializing in intelligent equipment.
 How to place an order?
Inquiry with us → Inform us of usage scenario → Receive product design recommendations → Confirm sample → Sign contract/Deposit → Mass production → Delivery.
 What transportation methods are available?
Express delivery, air freight, and sea freight are all supported based on your specific requirements.
 What is the production and shipping lead time?
The typical delivery time is 15-20 working days, depending on the order quantity.
 How to confirm payment matters?
We accept telegraphic transfer (T/T) and other standard payment methods. Please contact us to confirm before making payment.
 What if items are missing from my package?
Please contact our support team immediately. We will verify your order information and arrange for compensation delivery.
Footer Banner

Related Products